Kohl’s Shawnee

← Back to Projects
LOCATION
  • Shawnee, KS
SERVICES PROVIDED
  • Base Asphalt Mill and Overlay
  • Asphalt Mill and Overlay
  • Concrete Pad Replacement
  • Concrete Curb and Gutter
DURATION
  • 4 weeks

JOB SUMMARY

Entrusted with the comprehensive milling, paving, and striping of the entire property, executed in multiple mobilizations to ensure efficiency, minimal disruption, and a high-quality finished surface. Each phase was strategically planned to optimize workflow, maintain safety standards, and deliver a durable, long-lasting pavement solution tailored to the property’s needs.

CHALLENGES:

Ensuring the safety of the public while maintaining full accessibility for tenants throughout the project. Careful planning and strategic scheduling minimized disruptions, allowing for a smooth and efficient workflow without compromising safety or access.